The new prototype plant, known as STEP (Spherical Tokamak for Energy Production) will be built at the site of the former West Burton A coal power station near Retford and Gainsborough. The site was chosen by the government in 2022 as the location for the project, with the project’s delivery expected to create over 10,000 jobs ranging from construction to operations.

STEP works by combining hydrogen gases, deuterium and tritium, which are heated to over 150 million degrees Celsius and confined within a powerful magnetic field. The energy produced can then be used to create steam, to turn a turbine, generating electricity - just like in any conventional power plant.

  • HumanPenguin@feddit.uk
    link
    fedilink
    English
    arrow-up
    4
    ·
    8 days ago

    Ah did a little googling myself. No expert. But for anyone else wondering.

    Both is the answer

    The first positive consistent fusion was achieved in 2022. So over COVID. I may have missed it due to hiding ;)

    But yes this is experimental. But fully expected to be the first full scale power plant. So Def worth the UK gaining the experience and solving the issues.

    It is not expected till 2040. So 2.5b is way less over 15 years then it seemed.